Layouts 12/24/04—11/4/20

Start slideshow
DSCF1568 - Administrator (admin) Viewed: 2365 times.
DSCF1542 - Administrator (admin) Viewed: 2171 times.
DSCF1543 - Administrator (admin) Viewed: 2066 times.
The layout size as shown here is 8 feet 4.5 feet. Construction is Woodland Scenics Sub-terrain System - Chuck Harrington (myflyertrains) Viewed: 3390 times.
S-Helper S-Trax Flex is being used for the layout. The bridge is K-line. - Chuck Harrington (myflyertrains) Viewed: 3201 times.
A small village was to have lived in the clearing, but I decided to squeeze in a turntable and 7 stall roundhose instead! - Chuck Harrington (myflyertrains)…
The earth base coat wash is being applied. - Chuck Harrington (myflyertrains) Viewed: 3154 times.
S-Helper S-Trax Flex is being used for the layout. The bridge is K-line. - Chuck Harrington (myflyertrains) Viewed: 3173 times.
A "modified" Gilbert 720 switch has been fitted into the roadbed! Delair switch controls have been obtained in order to control the switches remotely. - Chuck…
The engines sit where the future engine house will be constructed. - Chuck Harrington (myflyertrains) Viewed: 2290 times.